Scope of work
- Structural and architectural works
- Site preparation and services
- Finishes
- Roads and paving
- Handover-related works
Site story
From open ground to finished streets
A photographic record of Grand Aura’s work at Budoor Baghdad — the structure of the houses, the roads that connect them, and the crews and plant that carry each block through to handover. The works were delivered in parallel with other packages across an active, multi-contractor master-planned city.
Structure, block by block
Blockwork walls, reinforced frames and slab pours advance house by house, with concrete placed by boom pump straight onto the deck.

Concrete pour by boom pump 
Blockwork and reinforced frames rising along a row 
Earthworks along the villa rows 
Blockwork crews
Roads laid to a finished surface
Grading, base compaction, asphalt laying and rolling run street by street, between finished kerbs and paved walkways.

Grading between rows of finished houses 
Asphalt laying beside a finished kerb 
Base compaction 
Rolling the new surface 
A pneumatic roller finishing the street
The team on the ground
Engineers, operators and crews coordinated daily, so every block moves from structure to finished street on one sequence.

An engineer checking the works on a slab 
Engineers setting out with survey equipment
Streets ready for handover
Finished houses, paved streets and planted verges, ready to be handed over as completed housing.

Rolling a finished street in front of the houses 
A finished boulevard at dusk 
Finished houses beside a new lawn 
Streets and rooftops from above
Related projects
Let’s plan your project
Tell us about the site, the scope and the governorate, and our team will come back to you.
Contact us