

Scope of work
- Passenger terminal
- Utility networks and drainage
- Paved access and circulation
- Interior finishes
Site story
A terminal finished to aviation standard
The Ziyarat passenger terminal and its supporting infrastructure — a government project serving pilgrimage traffic, built to aviation specifications under client supervision. Grand Aura’s works covered the terminal building, utility networks and drainage, and the paved access and circulation areas.
The terminal and its site
The terminal rises beside the airport’s control tower and support buildings, on an open desert site.

The control tower and support buildings 
The upper deck under construction
Porcelain and granite, laid to the line
Large-format white porcelain is laid in long fields, with black granite bands set flush to mark the passenger routes.

Black and white porcelain bands down the hall 
A granite band meeting the white field 
Joints held with levelling clips 
The polished floor at the entrance
Every tile set out and levelled
Tiling crews work to a checked grid: red levelling clips hold every joint true while the adhesive cures between the queue posts.

The tiling crew in the main hall 
The tile grid set out with spacers 
The spacer grid between the queue posts 
A dark granite strip down the concourse
Halls that reflect the light
Under the steel roof trusses, the finished floors run the full depth of each hall, mirroring the tall glazed facade.

The polished hall under the roof trusses 
The hall facing the glazed wall 
The floor along the glazed facade 
Finished floor around the planter
Granite curves and stone walls
A sweeping granite inlay leads through the main hall, while stone cladding in three tones of grey is cut and fixed on site.

The curved granite inlay in the main hall 
Window reflections on the new floor 
Stone cladding, a panel being cut
Related projects
Let’s plan your project
Tell us about the site, the scope and the governorate, and our team will come back to you.
Contact us
